Professional Services
IGSHPA ACCREDITED INSTALLER
Ground Loop Drilling & Installation
This is the process of drilling the vertical boreholes and installing the loops that make up the ground heat exchange system. Depending on your project the depth and number of holes will vary. The HDPE loops are grouted in place to ensure no fluid migration and highest possible heat transfer. All state permits are handled by SGS.

Interior Tie In & Purge
Once the ground heat exchange system is installed outside and routed into the building, the system is tied into the heat pump or pumps and purged. The purging process removes all air and debris from the system and adds the needed antifreeze. This step in the process is crucial to your system running smoothly and without interruption.

System Maintenance & Repair
If your system is not running correctly or if the ground heat exchanger is damaged we can fix the issue and get your system back up and running.

.png)